Industrial Lighting ROI Calculator
Estimate retrofit savings for a warehouse or industrial facility. Set fixture watts, operating days and unit cost to compare electricity use and payback.
Calculate Your Industrial LED Retrofit Savings
Adjust facility parameters, fixture specs and operating schedule. Results update in real time. No sign-up required.
Load an example, then adjust the values.
One estimate is saved on this browser.
Facility & Fixture Inputs
Enter your facility dimensions, current lighting and LED replacement details.
Total floor area of the facility to be retrofitted.
Record the mounting height for the layout review. Height alone does not determine the required fixture wattage.
Selecting a type auto-fills the wattage field below.
Watts per existing fixture (editable if custom).
Total fixtures to be replaced with LED.
Watts per LED high-bay fixture delivering equivalent lux.
Single-shift plants ~12h, continuous operations 24h.
Operating days per year (5-day weeks ~260, 24/7 ~365).
Use your site’s electricity tariff.
Factory-direct LED high-bay price (installation excluded).
Prepare the retrofit fixture shortlist
Use the fixture count and schedule to request wattage, light output and pricing. The estimate assumes a one-for-one replacement and excludes installation costs.
Estimate text
This calculation compares two equal-count lighting systems on the same operating schedule. Facility area and ceiling height provide project context; the entered watts and fixture count determine electricity savings.
Calculation method
- Annual hours = hours/day × operating days/year
- Annual kWh saved = (old watts − LED watts) × count × annual hours ÷ 1,000
- Payback (months) = LED purchase cost ÷ annual electricity savings × 12
Worked example
Fifty 400 W fixtures replaced by 150 W LEDs, running 12 hours/day for 300 days/year, save 45,000 kWh. At $0.12/kWh, savings are $5,400/year. A $120 unit price gives a $6,000 purchase cost and about 13.3 months’ payback.
Further reading
- U.S. Department of Energy: LED basics
Background on fixture efficacy, light quality and lifetime. The planning assumptions shown here are specific to this tool.
Current vs LED — Detailed Comparison
Side-by-side metrics for your facility. All values update live with the inputs above.
| Metric | Current | LED | Savings |
|---|---|---|---|
| Total Power Load | 0 W | 0 W | 0 W |
| Annual Energy Consumption | 0 kWh | 0 kWh | 0 kWh |
| Annual Energy Cost | $0.00 | $0.00 | $0.00 |
| Annual CO2 Emissions | 0 kg | 0 kg | 0 kg |
| 5-Year Net Savings | After initial investment | $0.00 | |
CO2 comparison assumption: 0.707 kg/kWh. The tree comparison uses 21 kg/year; both are illustrative, not site-specific reporting values.
Three Steps to Your Retrofit ROI
Enter Facility Details
Input your facility area, ceiling height, current fixture type, wattage and the number of fixtures to replace.
Get Instant ROI Analysis
The calculator instantly computes annual savings, payback period, energy reduction, CO2 avoided and 5-year net returns.
Request Custom Layout
Send a floor plan, rack heights, task areas, and proposed fixtures for a layout and quote.
Industrial Lighting ROI Calculator FAQ
How much can industrial LED lighting save on energy costs?
For example, replacing fifty 400W fixtures with 150W LEDs saves 45,000 kWh over 3,600 operating hours. Multiply by your tariff for the annual electricity saving, then check that the new layout provides the required light.
What is the payback period for industrial LED retrofit?
Payback depends on the installed cost and annual savings. Longer operating hours generally increase electricity savings, but labour, controls, and access costs can also be significant.
How does ceiling height affect LED fixture selection?
Use mounting height with the task light level, beam distribution, room geometry, and obstructions to select fixtures. A wattage recommendation based on height alone cannot establish the required illuminance.
Can I get a custom lighting layout for my facility?
Send the facility plan, mounting height, task requirements, and operating schedule when requesting a layout. Ask for the proposed fixture photometry and a report showing the calculation assumptions.